The M18 FUEL™ 6-1/2 in. circular saw is the fastest cutting 18 Volt cordless circular saw on the market, offering up to 30% faster cutting, 2X more run-time, and 5X the motor life of competitive saws. The POWERSTATE™ brushless motor provides cutting power above all other cordless circular saws, allowing applications that previously would have required a corded tool to perform. The REDLITHIUM™ XC 4.0 extended capacity battery pack delivers up to 2X the run-time of competitive 18 Volt tools and will provide more work per charge, and more work over the life of the pack than competitive batteries. The included REDLINK Plus™ intelligence system ensures optimized performance and protection from overloading, overheating, and over-discharging. The M18 FUEL™ 6-1/2 in. circular saw also features a cast magnesium shoe, upper and lower guards providing a durable and lightweight base. The tool also features an integrated LED light, and a rafter hook for easy storage on the job.
Features
- Magnesium shoe and upper and lower guards
- POWERSTATE™ Brushless motor delivers up to 30% faster cutting
- REDLITHIUM™ XC 4.0 battery packs for up to 2X longer run-time
- REDLINK™ PLUS Intelligence constantly monitors and controls the power delivery from battery to motor ensuring maximum performance
Includes
(1) M18 FUEL Circular Saw (2730-20)
Warranty
5 Years
Specifications
Battery Capacity : | 4Ah |
Batteries Included / Bare Tool: | Bare Tool |
Blade Wrench Included: | Yes - Stored on Tool |
Container Type: | Box |
Condition: | New |
Number of Blades Included: | 1 |
Bevel Stop: | Yes |
Blade Included: | Yes |
Color Finish: | Black; Red |
Battery Composition: | Lithium-Ion (Li-ion) |
Battery Voltage *: | 18 |
Bevel Capacity (°): | 50 |
Recharge Time (min): | 1 |
CSA Certified: | Yes |
ETL Listed: | Yes |
External Motor Brush Access: | Brushless Motor |
Integrated Work Light: | Yes |
Maximum Cut Depth at 45 Degrees: | 1.625 |
Maximum Cut Depth at 90 Degrees: | 2.1875 |
Motor Bearings: | Metal |
Number of Batteries Required: | 1 |
Product Storage Included: | No Case Included |
Spindle Lock: | Yes |
UL Listed: | Yes |
Variable Speed *: | Yes |
Blade Diameter (in) *: | 6.5 |
Handle Type *: | Top Handle |
Battery System *: | M18™ |
FUEL™ *: | Yes |
Power Tool Branding *: | FUEL™ |
Motor Type *: | Brushless |
Saw Blade Diameter: | 6-1/2 |
Integrated Light *: | Yes |
Battery Pack Replacement: | 35GJ99 |
Product Type *: | Cordless Circular Saw |
Drive Shape: | Direct Drive |
Electric Motor Brake: | Yes |
Housing Material: | Metal |
Integrated Rafter Hook: | Yes |
Shoe Material: | Cast Magnesium |
Saw Drive: | Direct Drive |
Badge Branding *: | FUEL |
Blade Location: | Left |
Handle Type: | D-Handle |
Corded Cordless: | Cordless |
Bevel Range: | 0 Degrees to 50 Degrees |
Saw Blade Diameter: | 37408 |
Powered Tool Power Source: | Electric - Cordless |
Depth Adjustment: | Yes |